SOP 1: Standard Production Deployment

When

A new release is ready to deploy to production.

Prerequisites

  • All CI checks pass (syntax, security scan, dependency audit)
  • PR reviewed and approved by at least one team member
  • Release tag created via protocol release:create
  • Config changes (if any) encrypted and pushed to config repo
  • Deployment window confirmed with the team

Procedure

# 1. Verify the release exists
protocol release:list

# 2. Run pre-deployment checks
protocol security:audit
protocol soc2:check

# 3. Deploy (release-based strategy)
protocol deploy:push v1.2.0

# 4. Verify the deployment
protocol status
protocol deploy:log

# 5. Run post-deployment health checks
# Check your application's health endpoints
# Verify key functionality manually or via smoke tests

Success Criteria

  • protocol status shows all containers running
  • protocol security:audit passes
  • protocol deploy:log shows the deployment with status=success
  • Application health endpoints return 200

If Deployment Fails

Proceed to SOP 3: Rollback.


SOP 2: First-Time Node Setup

When

Provisioning a new production node.

Procedure

# 1. Install Protocol
curl -sL https://raw.githubusercontent.com/merchantprotocol/protocol/master/bin/install | bash

# 2. Generate SSH key for git access
protocol key:generate
# Add the public key to your GitHub deploy keys

# 3. Clone the project repository
git clone git@github.com:your-org/your-app.git /opt/public_html
cd /opt/public_html

# 4. Initialize Protocol
protocol init

# 5. Set up the encryption key
# Option A: Copy from another node
protocol secrets:setup "your-64-char-hex-key"

# Option B: Receive via SCP from a node that has the key
# (run on the sending node)
# protocol secrets:key --scp=deploy@this-new-node

# 6. Install Wazuh SIEM agent
protocol siem:install --manager=wazuh.example.com

# 7. Start the node
protocol start

# 8. Verify
protocol status
protocol security:audit
protocol soc2:check
protocol siem:status

Post-Setup Checklist

  • Node appears in Wazuh dashboard
  • protocol soc2:check all pass
  • Crontab reboot recovery installed (protocol cron:add — done by start)
  • Node is reachable by load balancer / monitoring

SOP 3: Rollback

When

A deployment caused issues and needs to be reverted.

Procedure

# 1. Identify the current and previous versions
protocol deploy:log

# 2. Roll back to the previous version
protocol deploy:rollback

# 3. Verify the rollback
protocol status
protocol deploy:log
# Confirm the application is functioning on the previous version

# 4. Investigate the failed deployment
# Check application logs inside the container
protocol docker:logs

# Check the deployment audit trail
protocol deploy:log

After Rollback

  • Create an incident ticket documenting why the rollback was needed
  • Fix the issue on a branch and go through the normal deployment process
  • Do not attempt to re-deploy the failed version without fixing the root cause

SOP 4: Blue-Green (Shadow) Deployment

When

Zero-downtime deployment is required, or you want to validate before switching traffic.

Procedure

# 1. Initialize shadow deployment
protocol shadow:init

# 2. Build the new version in the shadow slot
protocol shadow:build v1.2.0

# 3. Check shadow status
protocol shadow:status

# 4. Verify the shadow deployment is healthy
# (test against the shadow port if applicable)

# 5. Promote the shadow to active
protocol shadow:start

# 6. Verify
protocol status
protocol deploy:log

If Shadow Fails

# Roll back the shadow promotion
protocol shadow:rollback

# Check status
protocol shadow:status

SOP 5: Configuration Changes

When

Environment variables, secrets, or config files need to change.

Procedure

# 1. Switch to the correct config branch
protocol config:switch <environment>

# 2. Edit the .env file
# (make your changes)

# 3. Encrypt the updated secrets
protocol config:init
# Select "Encrypt secrets"

# 4. Save and push
protocol config:save

# 5. On each production node, refresh the config
protocol config:refresh

# 6. Restart containers to pick up new env vars
protocol docker:compose:rebuild

Important

  • Never commit plaintext .env files
  • Always verify encryption worked: the .env.enc file should be updated, .env should be gitignored
  • Config changes are logged to the audit trail automatically

SOP 6: Emergency Hotfix

When

A critical bug needs to be fixed immediately outside the normal release cycle.

Procedure

# 1. Create a hotfix branch from the current production tag
git checkout -b hotfix/critical-fix v1.2.0

# 2. Make the fix, commit, push

# 3. Create a patch release
protocol release:create
# This creates v1.2.1

# 4. Deploy immediately
protocol deploy:push v1.2.1

# 5. Verify
protocol status
protocol security:audit

# 6. Merge the hotfix back to main
git checkout main
git merge hotfix/critical-fix
git push

After Hotfix

  • Create a post-incident review ticket
  • Ensure the fix is in the main branch
  • Verify the next regular release includes the hotfix

SOP 7: Key Rotation

See Key Rotation Procedure for the full process.

Quick reference:

protocol config:init         # Decrypt with old key
protocol secrets:setup # Generate new key
protocol config:init # Re-encrypt with new key
protocol config:save # Push to config repo
# Distribute key to all nodes via:
protocol secrets:key --scp=deploy@node
# Restart each node
protocol stop && protocol start

SOP 8: Security Incident Response

See Incident Response Runbook for the full process.

Quick reference:

# Detect
protocol security:audit
protocol soc2:check
protocol security:trojansearch

# Contain
protocol stop # Stop compromised node
protocol deploy:rollback # Roll back to known-good version

# Recover
protocol start # Restart from clean state
protocol security:audit # Verify clean

Deployment Checklist (Print-Friendly)

Use this checklist for every production deployment:

Pre-Deployment:
[ ] CI pipeline green
[ ] PR approved
[ ] Release tag created
[ ] Security scan passed
[ ] Config changes encrypted and pushed (if applicable)

Deployment:
[ ] protocol deploy:push <version> executed
[ ] protocol status shows all green
[ ] protocol deploy:log shows success
[ ] Application health check passes

Post-Deployment:
[ ] Notify team of deployment
[ ] Monitor for 15 minutes
[ ] Check error rates in application logs
[ ] Verify SIEM dashboard shows no new alerts

Schedule

ActivityFrequencyCommand
Security auditEvery deployment + weeklyprotocol security:audit
SOC 2 checkEvery deploymentprotocol soc2:check
Key rotationQuarterly (90 days)See key-rotation.md
Dependency auditWeekly (automated via CI)composer audit
SIEM reviewDailyWazuh dashboard
Incident response drillAnnuallySee incident-response.md